I.B.
35-557
31 of 45
TYPE PYC16 DELAYED-SENSITIVE TRIP TEST
Before commencing work, refer to the Safety Information.
If you have wires #11, #41 and #6 disconnected from the relay terminal block, reinstall them
before proceeding. On network protectors equipped with the type PYC16 delayed-sensitive
relay, the time delay relay is energized and the timing cycle initiated when the CAN or CHN
relay trip contact makes.
Switch Positions
Network protector closed, breaker does not have to be in the automatic mode.
FUNCTION Switch – “RELAY” position
I & PV Switch – AI position
Supp VM Switch – CA position
PHASE switch –180 position
Single PH Test Switch – OFF
VARIAC – zero position
SUPPLY Switch – 216 or 480 position depending on network system voltage
Rotate the VARIAC and increase the reverse current trip value until the CAN or CHN relay trip
contact makes. The timing cycle of the PYC16 starts from the instant the CAN or CHN relay trip
contact makes until the network protector breaker trips. On those relays equipped with a thermal time
delay element, allow the relay to cool to an ambient air temperature before commencing the test.
Содержание HWT-500
Страница 25: ...I B 35 557 25 of 45 THIS PAGE IS BLANK ...
Страница 42: ...I B 35 557 42 of 45 ...
Страница 43: ...I B 35 557 1 of 45 RELAYMODULEWIRING 216V Relay Module Wiring ...
Страница 44: ...I B 35 557 2 of 45 ...
Страница 45: ...I B 35 557 3 of 45 RELAYMODULEW IRING 480Volt Relay Module Wiring ...