
Basic Setup Programming
6–12
976-0043-01-01
Multi-Stage Charging Process
The charging cycle uses a multi-stage charging process to maintain the
batteries. Whenever AC power that is within the range of the inverter’s
settings is present at the inverter’s input, it passes power through to the
connected load and begins charging the batteries, indicated by the Bulk or
Float charge indicator LED on the control module.
Figure 6-2
Multi-Stage Battery Charging Process
Important:
The default settings of the
Sine Wave Plus
may or may not
work for your specific installation. Take the time to review the default
settings to make sure they are appropriate for your installation. If not, you
will need to adjust the settings according to the battery manufacturer’s
recommendations. The following information is provided to help you
make the necessary calculations.
Note:
This information is provided for guidance only. Variations in
battery chemistry, as well as, site specific environmental considerations
mean that you should consult your system designer or battery
manufacturer for specific recommendations for appropriate battery
voltage and current settings.
If a generator was automatically
started by the inverter to charge
the batteries, it will shut off
when the charger reaches the
FINISH stage after the bulk/
absorption period.
(GENERATOR must be in
AUTO MODE).
Bulk Stage
Absorption Stage
Finish Stage
DC
Voltage
AC
Current
Constant
Current
Reduced
Current
Reduced Current (Float)
Bulk Volts Setting
Float Volts Setting
Time
Max Charge
Amps Setting
Charging
Started
Increased
Voltage
Constant
Voltage
Reduced Voltage
Silent (battery voltage)
BULK DONE AMPS
or
MAX BULK/EQ TIME
No Current (Silent)
Absorption
Time
Содержание SW 2524
Страница 1: ...Sine Wave Plus Inverter Charger Owner s Manual Smart choice for power www xantrex com SW 2524 SW 2548...
Страница 2: ......
Страница 3: ...Sine Wave Plus Inverter Charger Owner s Manual...
Страница 24: ...xxii...
Страница 26: ...xxiv...
Страница 82: ...2 48...
Страница 101: ...DC Wiring 976 0043 01 01 3 19 Figure 3 9 BTS RJ11 Port Location and Installation BTS RJ11 Port DC End of the Inverter...
Страница 105: ...DC Wiring 976 0043 01 01 3 23 Figure 3 13 DC Connections to a Single Inverter...
Страница 107: ...DC Wiring 976 0043 01 01 3 25 Figure 3 14 DC Connections to Dual Inverters...
Страница 126: ...3 44...
Страница 127: ...4 Functional Test Chapter 4 Functional Test explains how to conduct a functional test of the inverter...
Страница 132: ...4 6...
Страница 139: ...Menu Map 976 0043 01 01 5 7 Figure 5 4 User Menu Map Part 2...
Страница 141: ...Menu Map 976 0043 01 01 5 9 Figure 5 6 Basic Setup Menu Map Part 2...
Страница 143: ...Menu Map 976 0043 01 01 5 11...
Страница 144: ...Navigation 5 12 976 0043 01 01...
Страница 145: ...Menu Map 976 0043 01 01 5 13...
Страница 146: ...Navigation 5 14 976 0043 01 01...
Страница 189: ...Menu Item Descriptions 976 0043 01 01 7 17 Figure 7 3 Relay 11 Wiring Example to Dual Inverters with Cooldown selected...
Страница 208: ...7 36...
Страница 240: ...8 32...
Страница 241: ...9 Troubleshooting Chapter 9 contains information and procedures for troubleshooting the Sine Wave Plus...
Страница 258: ...Inverter Specifications A 10 976 0043 01 01 Figure A 6 Time versus Current for the Sine Wave Plus 2548...
Страница 268: ...B 10...
Страница 286: ...C 18...
Страница 290: ...D 4...
Страница 294: ...E 4...
Страница 316: ...I 6...
Страница 319: ...Index 976 0043 01 01 IX 3...
Страница 320: ...Index IX 4 976 0043 01 01...
Страница 321: ......