InteliMains
NT
, SW version 3.0
InteliMains-NT-BTB-3.0-Reference Guide.pdf,
©ComAp – June 2013
165
This setpoint is used to prevent this situation. If the
already counting down (i.e. the condition for starting of next gen-set
based
on reserves is fullfiled
), the total load of running gen-sets reach 90% of
their nominal capacity and the remaining time of the running timer is higher
than
, the running timer is shortened to the value of
to speed up the start-up of the next gen-set.
N
OTE
:
The setpoint takes place only in island operation.
N
OTE
:
# sign in the name of this setpoint marks that this setpoint is shared among
all controllers connected by CAN2 bus.
12.2.8.24
Setpoint: #NextStopDel
Group
Pwr Management
Range [units]
0 .. 3600 [s]
Related FW
3.0
Description
This setpoint is used to adjust the delay of stopping the next gen-set when
the actual
load reserve
rises above the adjusted load reserve for stop.
N
OTE
:
# sign in the name of this setpoint marks that this setpoint is shared among
all controllers connected by CAN2 bus.
12.2.8.25
Setpoint: #SlowStopDel
Group
Pwr Management
Range [units]
0 .. 600 [s]
Related FW
3.0
Description
This setpoint is used to adjust how long the particular gen-set will suppress
it's own
Slow stop
alarm to give chance to another gen-set to start and
replace the defective one.
If there isn't any available gen-set to start, the alarm is not suppressed.
N
OTE
:
# sign in the name of this setpoint marks that this setpoint is shared among
all controllers connected by CAN2 bus.
Содержание IM-NT
Страница 86: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 86 APPENDIX...
Страница 326: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 326 17 User Notes...
Страница 327: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 327...
Страница 328: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 328...