InteliMains
NT
, SW version 3.0
InteliMains-NT-BTB-3.0-Reference Guide.pdf,
©ComAp – June 2013
62
M
ONTHLY
The timer is activated every "x-th" month on the selected day. The requested day
can be selected either as "y-th" day in the month or as "y-th" weekday in the
month. E.g. the timer can be adjusted to every 1st month on 1st tuesday.
S
HORT PERIOD
The timer is repeated with adjusted period (hh:mm). The timer duration is
included in the preriod.
The mode of each timer channel is adjusted by an assigned setpoint. The setpoints are located int
the
Timer settings
group and can be adjusted via InteliMonitor and GenConfig.
Figure:
Principial scheme of one block containing 4 timers
E
XAMPLE
:
Below is an example how to use the timers for periodic tests of the gen-set performed every sunday
with duration of 30 minutes and also for scheduled transfer of the load before expected mains failure
announced by the local electricity distribution company to 1.5.2010 from 01:00 to 04:00.
1. The output
T
IMER
A
CT
1-4
is configured internally in GenConfig (LBI tab) to the logical binary
inputs
R
EMOTE
TEST
and
T
EST
ON
LOAD
.
2. The setpoint
Timer settings:
TimerChannel 1
is adjusted to "repeated" mode, "weekly" period,
only sundays, starting date/time next sunday at 0:00, timer duration 0:30 min.
3. The setpoint
Timer settings:
TimerChannel 2
is adjusted to "once" mode, starting date/time
1.5.2010 at 01:00, timer duration 3:00 hrs.
Содержание IM-NT
Страница 86: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 86 APPENDIX...
Страница 326: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 326 17 User Notes...
Страница 327: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 327...
Страница 328: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 328...