Sea Tel 2400 Dual Band C/Ku
Installation in 144” Radome
4-17
EAR Controlled - ECCN EAR99
4.4.4.
Open the Radome Crate
We recommend that you place the Radome Crate in the area that you have chosen to assemble the
Radome onto the base frame.
1.
This is the Radome crate.
2.
Remove the
clips
around the
removable crate wall
to expose the
contents.
Radome Panels
Radome hardware kit
Silicon Adhesive
Radome Cap
3.
Use diagonal cutters, or shears, to
cut the bands that restrain the
radome panels in the crate. Do not
remove the panels at this time, they
will be removed during the radome
assembly (refer to the Antenna
Manual, Installation chapter).
Содержание Sea Tel 2400
Страница 10: ...Sea Tel 2400 Dual Band C Ku Table of Contents x EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 12: ...Safety Sea Tel 2400 Dual Band C Ku 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 16: ...Introduction Sea Tel 2400 Dual Band C Ku 2 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 80: ...Setup Targeting Sea Tel 2400 Dual Band C Ku 11 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 106: ...Stowing the Antenna Sea Tel 2400 Dual Band C Ku 17 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 120: ...Drawings Sea Tel 2400 Dual Band C Ku 19 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...