Installation in 144” Radome
Sea Tel 2400 Dual Band C/Ku
4-14
EAR Controlled - ECCN EAR99
59.
Carefully guide the cables &
isolation spring down through
the top of the Az post as the
pedestal & reflector assembly
is lowered.
60.
Hold the pedestal & reflector
assembly just above the top
of the AZ Post.
Isolation Assembly
Ground strap
Top flange of AZ Post
61.
Rotate the isolation section of
the pedestal to align the
ground strap to the left side
of the AZ Post).
62.
Align the mounting holes in
the bottom of the Isolation
Assembly to the holes in the
top of the AZ Post.
63.
Apply Loctite to the ground
bolt with a lock washer & flat
washer through the ring on
the ground strap and into the
threaded hole on the
underside of the AZ Post top
flange.
Содержание Sea Tel 2400
Страница 10: ...Sea Tel 2400 Dual Band C Ku Table of Contents x EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 12: ...Safety Sea Tel 2400 Dual Band C Ku 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 16: ...Introduction Sea Tel 2400 Dual Band C Ku 2 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 80: ...Setup Targeting Sea Tel 2400 Dual Band C Ku 11 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 106: ...Stowing the Antenna Sea Tel 2400 Dual Band C Ku 17 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 120: ...Drawings Sea Tel 2400 Dual Band C Ku 19 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...