Installation in 144” Radome
Sea Tel 2400 Dual Band C/Ku
4-12
EAR Controlled - ECCN EAR99
48.
Remove the 4 nylock nuts
from the bolts that pass up
through the wood and lower
isolation plate.
49.
Discard this hardware.
50.
Remove the 4 bolts in the U-
bracket that restrains the
Right side (shown) of the
cross-level beam.
51.
Remove the 4 bolts in the U-
bracket that restrains the Left
side (hidden in foreground) of
the cross-level beam.
52.
Remove the foam padding
from both sides of the cross-
level beam.
53.
Discard this hardware.
54.
Pass lifting straps through
eyes in the top of the cross-
level beam. These starps
must be long enough to clear
the top of the waveguides (as
seen in the next picture).
55.
Attach these 2 straps to a
crane or orther suitable lifting
mechanism.
Содержание Sea Tel 2400
Страница 10: ...Sea Tel 2400 Dual Band C Ku Table of Contents x EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 12: ...Safety Sea Tel 2400 Dual Band C Ku 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 16: ...Introduction Sea Tel 2400 Dual Band C Ku 2 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 80: ...Setup Targeting Sea Tel 2400 Dual Band C Ku 11 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 106: ...Stowing the Antenna Sea Tel 2400 Dual Band C Ku 17 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 120: ...Drawings Sea Tel 2400 Dual Band C Ku 19 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...