Sea Tel 2400 Dual Band C/Ku
Installation in 144” Radome
4-1
EAR Controlled - ECCN EAR99
4.
Installation in 144” Radome
This section contains instructions for unpacking, final assembly and installation of the equipment.
I t is highly
recommended that final assembly and installation of the Antenna system be performed by trained
technicians. Read this complete chapter before starting.
4.1.
General Cautions & Warnings
WARNI NG:
Assure that all nut and bolt assemblies are tightened according to the
tightening torque values listed below:
SAE Bolt Size
Inch Pounds
Metric Bolt Size
Kg-cm
1/4-20
75
M6
75.3
5/l6-18
132
M8
150
3/8-16
236
M10
270
1/2-13
517
M12
430
NOTE:
All nuts and bolts should be assembled using the appropriate Loctite thread-locker
product number for the thread size of the hardware.
Loctite # Description
222
Low strength for small fasteners.
242
Medium strength
638
High strength for Motor Shafts & Sprockets.
2760
Permanent strength for up to 1” diameter fasteners.
290
Wicking, High strength for fasteners which are already assembled.
WARNI NG:
Hoisting with other than a webbed four-part sling may result in catastrophic
crushing of the radome. Refer to the specifications and drawings for the fully assembled
weight of your model antenna/radome and assure that equipment used to lift/hoist this
system is rated accordingly.
CAUTI ON:
The antenna/radome assembly is very light for its size and is subject to large
swaying motions if hoisted under windy conditions. Always ensure that tag lines, attached
to the radome base frame, are attended while the antenna assembly is being hoisted to its
assigned location aboard ship.
4.2.
Preparation
Read this entire assembly procedure
before beginning.
Refer to the System Block diagram, General Assembly, Base Frame Assembly, Radome Assembly and Radome
Installation Arrangement drawings for your system.
We recommend that you place the crates in the area that you have chosen to assemble each of these major
components. It is recommended that you do not unpack the crates until you are ready to sub-assemble and install
the equipment.
Assure that you have a large, flat, level, open area to sub-assemble the general assembly and the upper & lower
sections of the radome. This area should be clean and free of debris. The site should also provide protection from
wind, rain and other adverse weather.
Содержание Sea Tel 2400
Страница 10: ...Sea Tel 2400 Dual Band C Ku Table of Contents x EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 12: ...Safety Sea Tel 2400 Dual Band C Ku 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 16: ...Introduction Sea Tel 2400 Dual Band C Ku 2 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 80: ...Setup Targeting Sea Tel 2400 Dual Band C Ku 11 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 106: ...Stowing the Antenna Sea Tel 2400 Dual Band C Ku 17 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 120: ...Drawings Sea Tel 2400 Dual Band C Ku 19 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...