Sea Tel 2400 Dual Band C/Ku
Installation in 144” Radome
4-15
EAR Controlled - ECCN EAR99
64.
Align the 4 mounting holes in
the lower isolation plate to
the holes in the top of the AZ
Post.
65.
Lower the pedestal & reflector
assembly to be on the top of
the AZ Post,
66.
Apply Loctite to and install
the 4 mounting bolts up
through the top of the AZ
Post & lower isolation plate.
67.
Install 4 flat washers & hex
nuts on the bolts and tighten
to torque spec.
68.
Remove the two screws
mounting the TX-RX Bracket
to the AZ Post.
69.
Attach the TX Coax to the TX
connector (upper connector)
on the inside of the bracket.
70.
Attach the RX Coax to the RX
connector (lower connector)
on the inside of the bracket.
71.
Apply loctite to and reinstall
the two screws to mount the
TX-RX Bracket to the AZ Post.
72.
Loop the pedestal power
cable from the bottom of the
AZ Post to interconnect it
with the pedestal power cable
from the ADE & Air
Conditioner breaker box.
73.
Slide the joined connectors
down into the retainer
bracket.
Содержание Sea Tel 2400
Страница 10: ...Sea Tel 2400 Dual Band C Ku Table of Contents x EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 12: ...Safety Sea Tel 2400 Dual Band C Ku 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 16: ...Introduction Sea Tel 2400 Dual Band C Ku 2 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 80: ...Setup Targeting Sea Tel 2400 Dual Band C Ku 11 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 106: ...Stowing the Antenna Sea Tel 2400 Dual Band C Ku 17 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 120: ...Drawings Sea Tel 2400 Dual Band C Ku 19 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...