Installation in 144” Radome
Sea Tel 2400 Dual Band C/Ku
4-4
EAR Controlled - ECCN EAR99
4.4.1.
Base Frame
To open and prepare the Base Frame use the following procedure.
1.
Remove the screws around 3
sides of the perimeter of the
base of the crate.
Leave this side (with the
Opening) in place
2.
Lift the top of the crate off of
the pallet.
3.
Move the top of the crate away
from the work area.
4.
You can assemble the ADE with
the base frame bolted to the
pallet, or remove it from the
pallet.
Содержание Sea Tel 2400
Страница 10: ...Sea Tel 2400 Dual Band C Ku Table of Contents x EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 12: ...Safety Sea Tel 2400 Dual Band C Ku 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 16: ...Introduction Sea Tel 2400 Dual Band C Ku 2 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 80: ...Setup Targeting Sea Tel 2400 Dual Band C Ku 11 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 106: ...Stowing the Antenna Sea Tel 2400 Dual Band C Ku 17 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 120: ...Drawings Sea Tel 2400 Dual Band C Ku 19 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...