Installation in 144” Radome
Sea Tel 2400 Dual Band C/Ku
4-2
EAR Controlled - ECCN EAR99
A hoist, or small crane, is needed to assemble these sub-assemblies to form the final ADE Assembly.
As an example, you might sub-assemble everything on the pier where the ship will tie up, then use the crane to put
the sub-assemblies together and lift the whole ADE up to the mounting location on the ship.
You can change order of these steps; however, in the end the objective is to have a well sealed
radome with flanges that well aligned and are clean of excess caulking.
4.3.
Separate the Base Frame & Radome Crates
The Baseframe Crate is banded together with the Radome crate for shipment.
CAUTION:
The baseframe crate weighs 650 lbs. Do NOT attempt to move it or lay it
down by hand. Use a forklift to lay the crate down and move it, as described below.
1.
This is the Base Frame & Radome crates
banded together.
ASSURE that these
crates are NOT on inclined ground,
so that the baseframe does not tip
over when the banding is removed.
Radome Crate
Baseframe Crate
2.
Pass a web lifting strap through the hole
in the top of the center beam of the base
frame pallet. This strap will be used to
lower the baseframe crate down.
3.
Using tin snips, cut the metal banding.
Содержание Sea Tel 2400
Страница 10: ...Sea Tel 2400 Dual Band C Ku Table of Contents x EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 12: ...Safety Sea Tel 2400 Dual Band C Ku 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 16: ...Introduction Sea Tel 2400 Dual Band C Ku 2 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 80: ...Setup Targeting Sea Tel 2400 Dual Band C Ku 11 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 106: ...Stowing the Antenna Sea Tel 2400 Dual Band C Ku 17 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 120: ...Drawings Sea Tel 2400 Dual Band C Ku 19 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...