Cisco SCE 1000 2xGBE Installation and Configuration Guide
OL-7821-05
7-1
This chapter describes how to start up the
SCE 1000
platform, reboot, and shutdown. It also
describes how to manage configurations.
This chapter contains the following sections:
•
Starting the SCE 1000 Platform
7-1
•
Managing SCE 1000 Configurations
7-4
•
Performing Complex Configurations
7-7
•
Displaying the SCE Platform Version Information
7-8
•
Displaying the SCE Platform Inventory
7-9
•
Displaying the System Uptime
7-10
•
Rebooting and Shutting Down the SCE Platform
7-10
Starting the SCE 1000 Platform
The procedures for starting the
SCE 1000
platform are explained in the following sections:
•
Checking Conditions Prior to System Startup
(on page
7-1
)
•
Starting the System and Observing Initial Conditions
(on page
7-2
)
Checking Conditions Prior to System Startup
Check the following conditions before you start your
SCE 1000
platform:
•
Both power supply units are installed and connected
•
First-time startup at installation:
•
SCE 1000
platform connected to local console (CON port)
•
The console terminal is turned on and properly configured
•
Subsequent startups
•
Line and Cascade interfaces are properly cabled (optional)
C H A P T E R 7
Basic SCE 1000 Platform Operations