Chapter 2 Introduction to the SCE Platform
SCE 1000 Installation Checklist
Cisco SCE 1000 2xGBE Installation and Configuration Guide
OL-7821-05
2-7
Table
2-5 SCE
1000
Installation Checklist
Task Verified
By
Date
Date
SCE 1000
received
SCE 1000
and all accessories unpacked
Safety recommendations and guidelines reviewed
Topology verified: number of
SCE 1000
platforms, number of links, and
whether inline or receive-only
Installation Checklist copied
Site log established and background information entered
Site power voltages verified
Site environmental specifications verified
Required passwords, IP addresses, device names, and so on, needed for initial
configuration available (refer to Setup Command Parameters)
Required tools available
Network connection equipment available
SCE 1000
mounted in rack (optional)
AC/DC power cables connected to AC/DC sources and
SCE 1000
platform
Console port set for 9600 baud, 8 data bits, no parity, and 1 stop bit (9600
8N1)
ASCII terminal attached to console port
FE management port is operational
GBE line ports operational
Network interface cables and devices connected
System power turned on
System boot complete (SYSTEM–UP LED is on)
Correct hardware configuration displayed after system banner appears