Chapter 2 Introduction to the SCE Platform
Checking the Shipping Container Contents
Cisco SCE 1000 2xGBE Installation and Configuration Guide
OL-7821-05
2-5
Checking the Shipping Container Contents
Use the
SCE 1000
Component List to check the contents of the
SCE 1000
platform shipping
container.
Do not discard the shipping container. You need the container if you move or ship the
SCE 1000
platform in the future.
SCE 1000 Component List
Table
2-4 SCE
1000
Component List
Component Description
Received
SCE 1000
platform
SCE 1010 2xGBE platform configured with either AC or
DC power supplies.
Accessories
The following accessories might arrive in separate shipping
containers:
•
Rack mount kit
•
Two mounting brackets for 19” rack
•
Six screws (Philips), 8-32 x 3/8” (for attaching the
brackets to the
SCE 1000
chassis)
•
supporting mounting brackets for 19” rack
•
Two crossrail supports for 19” rack with front and back
posts
•
Management
cables
•
Fast Ethernet cable for connecting to the Management
ports
•
RS-232 serial cable (DB-9 to RJ-45) for connecting to a
local terminal
•
Power cables
Two AC power supply cords,if ordered with AC-input
power supply units
•
Grounding kit
•
Grounding cable
•
Two Hex nuts (#¼”)
•
Two spring washers (#¼”)
•
Documentation
If ordered,
SCE 1000
hardware and software
documentation set and the Cisco Documentation CD-ROM
package*
Optional Equipment Four rubber feet for tabletop installation
External Optical
Bypass module kit
•
1 External Optical Bypass module
•
1 19" rack mounting panel
•
1 control cable
*Titles and quantities of documents will vary. You must order the type and quantity of documentation
sets when you order the hardware.