Check
See
Step
Installing AC Input Power Cords, on page
53
or
Installing DC Input Power Cables , on
page 55
section
8. Install either AC or DC input power
connections to the power trays.
Powering On the Fabric Card Chassis , on
page 57
section
9. Power on the FCC.
Installing the Shelf Controller Cards and
Fabric Cards , on page 61
section
10. Install the shelf controller cards and fabric
cards in the FCC.
Cabling a Multi-Chassis Configuration, on
page 137
section
11. Connect the cabling for multi-chassis
configuration.
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
2
Installation Roadmap
Installation Roadmap