e) Remove the filler panels from the FCC.
Figure 55: Removing the Filler Panels
Two 8-32 screws
3
Filler panel (one each side)
1
Guide pins
2
Step 4
Remove the two upper and lower horizontal cable management brackets by loosening and removing the eight pan-head
screws (four per bracket).
Step 5
Remove the left and right vertical cable troughs from the front of the FCC.
We recommend that you use two people to remove the vertical cable troughs, one person to hold the vertical
cable troughs while the other person removes the pan-head screws.
Note
For each vertical trough:
a) Loosen the captive screw on the two trough retention brackets and swing the brackets away.
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
92
Removing and Replacing Chassis Components
Removing the Front Exterior Cosmetics