![Cisco Network Convergence System 6000 Fabric Card Chassis Скачать руководство пользователя страница 93](http://html.mh-extra.com/html/cisco/network-convergence-system-6000-fabric-card-chassis/network-convergence-system-6000-fabric-card-chassis_hardware-installation-manual_63785093.webp)
Installing the Fabric Cards
Installing an S2 Fabric Card
Unless otherwise noted, the information in this section applies to the NCS-F-FC and NCS-F-FC2 fabric
cards.
Note
This section describes how to install an S2 fabric card in the Cisco NCS 6000 FCC.
Prerequisites
•
Use the
show running-config controller fabric plane
command to display the configured fabric planes
and the associated S2 fabric cards for each fabric plane. Then shut down the fabric plane to avoid traffic
loss. The following example shows how to shut down plane X (where X is in the range of 0 to 5).
config
controller fabric plane X
shutdown
commit
•
Open the cosmetic doors, if installed.
Required Tools and Equipment
•
ESD-preventive wrist strap
•
Number-2 Phillips screwdriver or number-2 common (flat-head) screwdriver
•
S2 Fabric Card (Cisco PID NCS-F-FC or NCS-F-FC2)
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
79
Installing the Shelf Controller Cards and Fabric Cards
Installing the Fabric Cards