Chapter 3 Installing WLSE 1130-19 Hardware
Installing the WLSE 1130-19 in a Rack
3-10
Installation and Configuration Guide for the CiscoWorks Wireless LAN Solution Engine
78-16345-01
Step 2
Attach the chassis to the rack:
a.
See
Figure 3-7
. Secure chassis to the inner rail using three screws. Repeat this
process with
the other server rail.
Figure 3-7
Attaching Chassis to Rail
95525