1�- VERIFICATION UPON RECEPTION
1.1.- PROTOCOLO DE RECEPCIÓN
Check the following points upon receiving the device:
a) The device meets the specifications described in your order.
b) The device has not suffered any damage during transport.
c) Perform an external visual inspection of the device prior to switching it on.
d) Check that it has been delivered with the following (
Figure 1
and
Table 2
):
Table 2: Scope of delivery�
Object
Description
quantity
A
CirPower Hyb
4kW Inverter
1
B
Wall-mounting support
1
C
PV + connector
2
D
PV - connector
2
E
Grid connector
1
F
Load connector
1
G
Documentation: Instruction manual
1
-
3 poles RS-485 connector
1
-
Temperature sensor 2 pole connector
1
-
10k Ohm resistor
1
A
B
C
D
F
E
G
Figure 1: Scope of delivery�
e) Check that the delivered device matches the purchasing order, and that the electrical
specifications meet the electrical grid to be connected to. Check specifications plate in
the bottom part of the device.(
Figure 2
).
7
Instruction Manual
CirPower Hyb 4k-48