To Install:
1. Install new gaskets onto the intake manifold.
2. Apply a 0.2 in (5 mm) bead of threadlock to the intake manifold bolts.
Intake manifold bolt tightening sequence
3. Attach the intake manifold to the cylinder head. Torque the bolts, in sequence, to
44 in-lb (5 Nm).
Torque the bolts again, in sequence, to
89 in-lb (10 Nm).
4. Place the upper engine harness over the engine and install the retainer nut. Torque
the nut the
89 in-lb (10 Nm).
5. Attach the vacuum brake booster hose to the intake manifold.
6. Attach the fuel feed pipe to the fuel rail.
7. Install the evaporative emission (EVAP) purge solenoid vent tubes onto the engine.
8. Attach the heater water shutoff valve actuator inlet hose to the intake manifold.
9. Install the positive crankcase ventilation (PCV) hose from the engine.
10. Install the harness clips to the fuel rail.
11. Connect the mass air flow (MAF)/intake air temperature (IAT) sensor, fuel injectors,
evaporative emission (EVAP) purge solenoid, throttle body harness, manifold
absolute pressure (MAP) sensor, ignition coil harnesses, and generator
connectors.
12. Install the harness clips onto the fuel rail.
13. Connect the A/C compressor pressure switch connector.
14. Attach the harness clip to the cylinder head.
15. Install the air cleaner outlet duct into the engine compartment.
16. Disconnect the negative battery cable from the battery.
17. Check the fuel system for leaks by turning the ignition to on, with the engine off for
2 seconds. Turn the ignition to off for 10 seconds. Turn the ignition to on with the
engine off.
Oil Pan
Содержание TrailBlazer
Страница 1: ......
Страница 26: ...Fig 3 Typical body and undervehicle maintenance locations Refer to chart for descriptions ...
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 59: ...Cylinder head bolt removal and installation 32 Remove and discard the bolts from the cylinder head ...
Страница 175: ...Spring free length check Valve spring squareness check ...
Страница 192: ...Front of piston mark ...
Страница 361: ...5 3L Engine Except Saab Underhood Fuse Block 2003 2005 Early Production ...
Страница 469: ...Removing the outer band from the CV boot Removing the inner band from the CV boot ...
Страница 470: ...Removing the CV boot from the joint housing Clean the CV joint housing prior to removing boot ...
Страница 471: ...Removing the CV joint housing assembly Removing the CV joint ...
Страница 472: ...Inspecting the CV joint housing Removing the CV joint outer snap ring ...
Страница 473: ...Checking the CV joint snap ring for wear CV joint snap ring typical ...
Страница 474: ...Removing the CV joint assembly Removing the CV joint inner snap ring ...
Страница 475: ...Installing the CV joint assembly typical ...
Страница 506: ...Tie Rod End Removal Installation Inner Tie Rod End To Remove Inner tie rod assembly Magnasteer ...
Страница 553: ...9 Torque the lug nuts to specification 10 Lower the vehicle ...
Страница 556: ...Toe in Frame Misalignment Frame misalignment ...
Страница 588: ...Bleeding caliper ...
Страница 596: ...Inboard brake pad removal and installation 10 Remove the inboard brake pad from the brake caliper ...
Страница 624: ...Manifold gauge set components Refrigerant recovery recycling station ...
Страница 662: ...Lower instrument panel retaining volts 25 Remove the lower retaining bolts from the instrument panel I P ...
Страница 676: ...A C Specifications ...
Страница 677: ......