
2. Check the ring side clearance of the compression rings with a feeler gauge
inserted between the ring and its lower land according to specification. The gauge
should slide freely around the entire ring circumference without binding. Any wear
that occurs will form a step at the inner portion of the lower land. If the lower lands
have high steps, the piston should be replaced.
Bearing cap notch
3. Unless new pistons are installed, be sure to install the pistons in the cylinders from
which they were removed. The numbers on the connecting rod and bearing cap
must be on the same side when installed in the cylinder bore. If a connecting rod is
ever transposed from one engine or cylinder to another, new bearings should be
fitted and the connecting rod should be numbered to correspond with the new
cylinder number. The notch on the piston head goes toward the front of the engine.
4. Install all rod bearing inserts into the rods and caps.
Содержание TrailBlazer
Страница 1: ......
Страница 26: ...Fig 3 Typical body and undervehicle maintenance locations Refer to chart for descriptions ...
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 59: ...Cylinder head bolt removal and installation 32 Remove and discard the bolts from the cylinder head ...
Страница 175: ...Spring free length check Valve spring squareness check ...
Страница 192: ...Front of piston mark ...
Страница 361: ...5 3L Engine Except Saab Underhood Fuse Block 2003 2005 Early Production ...
Страница 469: ...Removing the outer band from the CV boot Removing the inner band from the CV boot ...
Страница 470: ...Removing the CV boot from the joint housing Clean the CV joint housing prior to removing boot ...
Страница 471: ...Removing the CV joint housing assembly Removing the CV joint ...
Страница 472: ...Inspecting the CV joint housing Removing the CV joint outer snap ring ...
Страница 473: ...Checking the CV joint snap ring for wear CV joint snap ring typical ...
Страница 474: ...Removing the CV joint assembly Removing the CV joint inner snap ring ...
Страница 475: ...Installing the CV joint assembly typical ...
Страница 506: ...Tie Rod End Removal Installation Inner Tie Rod End To Remove Inner tie rod assembly Magnasteer ...
Страница 553: ...9 Torque the lug nuts to specification 10 Lower the vehicle ...
Страница 556: ...Toe in Frame Misalignment Frame misalignment ...
Страница 588: ...Bleeding caliper ...
Страница 596: ...Inboard brake pad removal and installation 10 Remove the inboard brake pad from the brake caliper ...
Страница 624: ...Manifold gauge set components Refrigerant recovery recycling station ...
Страница 662: ...Lower instrument panel retaining volts 25 Remove the lower retaining bolts from the instrument panel I P ...
Страница 676: ...A C Specifications ...
Страница 677: ......