
To Install:
1. For 2002 through 2005 vehicles, attach the electronic brake control module
(EBCM) from the brake pressure modulator valve (BPMV). Torque the new T-25
TORX® screws to
39 in-lb (5 Nm)
.
2. For 2006 through 2007 vehicles, attach the electronic brake control module
(EBCM) from the brake pressure modulator valve (BPMV). Torque the new screws
to
26 in-lb (3 Nm)
.
3. Connect the ABS pump motor connector.
4. Attach the brake pressure modulator valve (BPMV) to the mounting bracket.
5. Connect the electronic brake control module (EBCM) connectors.
6. Connect the brake pipes from the brake pressure modulator valve (BPMV). Torque
the pipe fittings to
18 ft-lb (25 Nm)
.
7. Bleed the brake system.
Bleeding
NOTE:
Wait until the brake pedal is firm to drive the vehicle.
NOTE:
Do not reuse the brake fluid used to bleed the system.
NOTE:
Use this procedure only for base brakes.
1. Lift the vehicle high enough to access the bleed screws.
2. Start the procedure with the right rear wheel.
3. Install a clear hose onto the bleed screw.
4. Place the other end of the clear hose into a container partially filled with clean DOT
3 brake fluid.
5. Turn the bleed screw ½ to one turn.
6. Slowly depress the brake pedal.
7. When the brake pedal is fully depressed, turn the bleed screw to close.
8. Release the brake pedal and wait 10 to 15 seconds for the master cylinder pistons
to return to standing position.
9. Repeat steps 3 through 8 for the remaining wheels.
NOTE:
More than a pint of brake fluid may be used per wheel for this procedure.
Check the fluid level in the master cylinder reservoir every four to six strokes.
10. Firmly press in on the brake pedal and run the scan tool automated bleed
procedure. Release the brake pedal between each test.
11. Repeat steps 3 through 8 for all four wheels until the brake pedal is firm.
Содержание TrailBlazer
Страница 1: ......
Страница 26: ...Fig 3 Typical body and undervehicle maintenance locations Refer to chart for descriptions ...
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 59: ...Cylinder head bolt removal and installation 32 Remove and discard the bolts from the cylinder head ...
Страница 175: ...Spring free length check Valve spring squareness check ...
Страница 192: ...Front of piston mark ...
Страница 361: ...5 3L Engine Except Saab Underhood Fuse Block 2003 2005 Early Production ...
Страница 469: ...Removing the outer band from the CV boot Removing the inner band from the CV boot ...
Страница 470: ...Removing the CV boot from the joint housing Clean the CV joint housing prior to removing boot ...
Страница 471: ...Removing the CV joint housing assembly Removing the CV joint ...
Страница 472: ...Inspecting the CV joint housing Removing the CV joint outer snap ring ...
Страница 473: ...Checking the CV joint snap ring for wear CV joint snap ring typical ...
Страница 474: ...Removing the CV joint assembly Removing the CV joint inner snap ring ...
Страница 475: ...Installing the CV joint assembly typical ...
Страница 506: ...Tie Rod End Removal Installation Inner Tie Rod End To Remove Inner tie rod assembly Magnasteer ...
Страница 553: ...9 Torque the lug nuts to specification 10 Lower the vehicle ...
Страница 556: ...Toe in Frame Misalignment Frame misalignment ...
Страница 588: ...Bleeding caliper ...
Страница 596: ...Inboard brake pad removal and installation 10 Remove the inboard brake pad from the brake caliper ...
Страница 624: ...Manifold gauge set components Refrigerant recovery recycling station ...
Страница 662: ...Lower instrument panel retaining volts 25 Remove the lower retaining bolts from the instrument panel I P ...
Страница 676: ...A C Specifications ...
Страница 677: ......