3-2
Axxius 800 - Release 2.2
Electrical Installation and Cabling
Compliant Installation
Compliant Installation
WARNING!
A
LL
TELECOMMUNICATION
NETWORK
CONNECTIONS
MUST
USE
MINIMUM
26 AWG
WIRE
.
1. Mount unit in an area that meets Environment conditions, see Installation
Environment on page 2-3.
2. Unit should have power supply(s), controller(s) and Interface cards installed
before power up.
NOTE:
All cards (power supplies, controllers, interface, relay and service)
slide into the unit in the same manner. There are guides for each slot (top
and bottom), which the card follows until it is firmly seated into the
backplane.
3. Ground the system, secure the ground lugs to the terminals using the nuts
provided. Attach #6 or #8 AWG copper wire to the terminal.
4. Install service cards.
5. Install blank faceplates in any slot that is not occupied.
6. Connect BITS Clock 1 and/or 2
7. Connect Alarming
8. Secure the power cable and the ground cable with a plastic tie (not included).
Keep these cables separate from the signal cables.
9. Terminate each signal cable to its appropriate connector.
10. Secure the signal cables using the small holes along the bottom of the rack and
plastic ties (not included).
11. Plug in power, to the system, apply the appropriate power for the installed
Power Supply(s)
Содержание Network Device Axxius 800
Страница 1: ...Axxius 800 USER MANUAL Part Number 770 0104 AG Product Release 2 2 May 2004 ...
Страница 32: ...xxxii Axxius 800 Release 2 2 Table of Contents ...
Страница 50: ...1 18 Axxius 800 Release 2 2 Base Platform ACO ...
Страница 101: ...CHAPTER CLI Commands In this Chapter n Command Line Interface Help n CLI Commands ...
Страница 392: ...8 8 Axxius 800 Release 2 2 FXO Voice Card Channel Associated Signaling CAS Conversions ...
Страница 430: ...12 8 Axxius 800 Release 2 2 Power Supply Installing Replacing a Power Supply ...
Страница 472: ...15 20 Axxius 800 Release 2 2 Terminal Server Router Card LEDs ...
Страница 500: ...18 12 Axxius 800 Release 2 2 Maintenance Hot Swap Service Card ...
Страница 511: ...APPENDIX Loopback Tests In this Appendix n Overview n DS1 Loopbacks n V 35 Loopbacks n V 35 V 54 Loop ...
Страница 532: ...C 22 Axxius 800 Release 2 2 Loopback Tests V 35 V 54 Loop ...
Страница 552: ...Glossary 20 Axxius 800 Release 2 2 Glossary ...