Appendix
16
93
We reserve the right to make any changes due to technical modifications!
Installation and Servicing Instructions Logamax plus GB142-24/30/45/60 • Version 12/2004
Buderus Hydronic Systems • http://www.buderus.net
17.3 Maintenance report
z
Sign for the maintenance activities that you have
carried out and enter the date.
Needs-dependent maintenance activities
Page Date: _____________
Date: _____________
1.
Clean the burner, the heat exchanger and the condensate
trap. First shut down the heating system
46
2.
Check and adjust the gas/air ratio
CO
2
content with full load
CO
2
content with partial load
31
_____________ inch W.C.
_______________ %
_______________ %
_____________ inch W.C.
_______________ %
_______________ %
3.
Confirm proper maintenance
Company stamp/
Signature
Company stamp/
Signature