92
We reserve the right to make any changes due to technical modifications!
Installation and Servicing Instructions Logamax plus GB142-24/30/45/60 • Version 12/2004
Buderus Hydronic Systems • http://www.buderus.net
Appendix
16
17.2 Inspection report
z
Please indicate the inspection activities that you
have carried out and enter the values measured.
Inspection activities
page Date: ______
Date: ______
Date: ______
1. Test the general condition of the heating system
2. Carry out a visual inspection and test the functions of the
heating system
3. Test all gas and water conduits and fittings for:
– their tightness during operation
– visible corrosion
– signs of aging
– fill the condensate trap
45
44
29
4. Check the burner, the heat exchanger and the condensate trap
for pollution. First shut down the heating system
46
5. Check the burner and the ignition and ionization electrodes.
First shut down the heating system
46
6. Measure the ionization current
33
_______ µA
_______ µA
_______ µA
7. Measure the gas connection pressure (flow pressure)
30
_______ psi
_______ psi
_______ psi
8. Check the gas/air ratio
31
_____ inch W.C. _____ inch W.C. _____ inch W.C.
9. Carry out a gas tightness test in operating conditions
45
10. Measure the carbon monoxide content (CO)
45
_______ ppm
_______ ppm
_______ ppm
11. Check the water pressure of the heating system
– Inlet pressure of expansion tank (also see the
Installation Instructions for the expansion tank)
– Filling pressure
27
27
_______
_______ psi
_______ psi
12. Check the operation and safety of the air intake and flue pipe
30
13. Check that the thermostat is set in line with the needs
(see documents with thermostat)
36
14. Final check of inspection activities, note down the
measurement and test results
15. Confirm proper inspection
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature