Servicing
14
49
We reserve the right to make any changes due to technical modifications!
Installation and Servicing Instructions Logamax plus GB142-24/30/45/60 • Version 12/2004
Buderus Hydronic Systems • http://www.buderus.net
14
Servicing
14.1 Checking the UBA3 fuse; replace if
necessary
z
Disconnect the heating system from the power
supply, remove the main fuse or switch off circuit
breaker.
z
Set the main switch on the BC10 to "0" (Off).
z
Remove the casing.
z
Loosen the fastening screw of the UBA3 (see fig. 43,
pos. 1).
z
Remove the UBA3 by pulling it forward as indicated
by the arrow (see fig. 43, pos. 2).
z
Dismantle the fuse holder by loosening the bayonet
connector (see fig. 44, pos. 1).
z
Remove the fuse from the fuse holder.
z
Check the circuit continuity through the fuse using
the volt-ohm-multiammeter. If broken, replace it by
(a new) spare fuse 5 amps, 120 V slow blow (fig. 44,
pos. 2).
z
Re-assemble the UBA3 in reverse order of
disassembly.
z
Fit the casing.
z
Connect the heating system to the power supply.
z
Set the main switch on the BC10 to "1" (On).
14.2 External connection board fuse
z
Disconnect the heating system from the power
supply via the circuit breaker.
z
Set the main switch on the BC10 to "0" (Off).
z
Remove the casing.
z
Remove the cover from the connection box (fig. 45).
Fig. 43
Dismantling the UBA3
1
2
Fig. 44
Checking the fuses
2
1
Fig. 45
Removing the cover from the connection box