Servicing
14
59
We reserve the right to make any changes due to technical modifications!
Installation and Servicing Instructions Logamax plus GB142-24/30/45/60 • Version 12/2004
Buderus Hydronic Systems • http://www.buderus.net
z
Fit the casing.
z
Connect the heating system to the power supply,
insert the main fuse or switch on the circuit breaker.
z
Set the main switch on the BC10 to "1" (On).
14.14 Testing the ionization current
z
Disconnect the heating system from the power
supply, remove the main fuse or switch off the circuit
breaker.
z
Set the main switch on the BC10 to "0" (Off).
z
Remove the casing.
z
Disconnect the plug and socket connection of the
monitoring cable.
z
Connect the measuring device in series (see fig. 64).
z
Set the multi-meter to DC µA.
z
Connect the heating system to the power supply,
insert the main fuse or switch on the circuit breaker.
z
Set the main switch on the BC10 to "1" (On).
z
Start up the appliance in accordance with the
"Service Mode" menu.
z
Test the ionization current at partial load. The appli-
ance is in part-load operation as soon as, in the
"Service Mode" menu,
.<D
is selected.
The ionization current must be > 1.4 DC µA.
z
Remove the measuring device.
z
Reconnect the plug and socket connection of the
monitoring cable if the ionization current is OK.
z
Fit the casing.
z
Connect the heating system to the power supply,
insert the main fuse or switch on the circuit breaker.
z
Set the main switch on the BC10 to "1" (On).
Fig. 64
Testing the ionization current
WARNING!
Avoid damage: do not push the measuring
pin of the volt-ohm-multiammeter too
deeply into the socket.