© BTG
Operation Manual Mütek
TM
PCD-05, September 2017
57
VIII. Shutting down the system, storage and disposal
VIII. Shutting down the system, storage and disposal
8.1 Safety
instructions
Please adhere to the applicable safety rules when shut-
ting down the system.
8.2 Personnel
requirements
The system shall only be shut down by qualified and
skilled personnel.
8.3 Shutting down the system
To place the Mütek™ PCD-05 out of operation, proceed
as follows:
• Turn off the instrument.
• Disconnect the instrument from the mains.
• If applicable, disconnect the Mütek™ PCD-05 from
the titrator.
• Clean the measuring cell (see chapter 7.1.2 "Clea-
ning the measuring cell", page 53).
If you use a pH electrode:
• Clean the pH electrode with a 3 M KCl solution.
• Prevent the diaphragm of the pH electrode (4, Fig.
3-6) from drying up. Fill the cap of the pH electrode
with 3 M KCl solution and keep the electrode in this
cap in times of disuse.
8.4 Storage
Store the Mütek™ PCD-05 in a suitably protected place.
Do not keep outdoors.
8.5 Disposal
8.5.1
Official Regulations
Be sure to meet the current local regulations governing
the disposal of the Mütek™ PCD-05.
Содержание Mutek PCD-05 Smart
Страница 1: ...Operation Manual MütekTM PCD 05 Smart Light Particle Charge Detector ...
Страница 50: ...50 Operation Manual MütekTM PCD 05 September 2017 BTG V Measuring ...
Страница 58: ...58 Operation Manual MütekTM PCD 05 September 2017 BTG VIII Shutting down the system storage and disposal ...
Страница 61: ......
Страница 62: ...BTG Instruments AB P O Box 602 SE 661 29 Säffle Sweden Phone 46 533 426 00 www btg com ...