28
Operation Manual Mütek
TM
PCD-05, September 2017
© BTG
IV. Installation
4.6.3
Startup of PCD-05 Smart
4.6.3.1 Connect smart display
• Mount the smart display and connect the cable at
the back (see 2/Fig. 3-3).
Fig. 4-4
Connection of smart display
4.6.3.2 Connect Travel titrator module
• Mount the Travel titrator module and connect the
cable at the back (see 7/Fig. 3-3).
Fig. 4-5
Connection of Travel titrator module
Inserting titrant solutions
Fig. 4-6
Inserting titrant solutions
Designations
1
Travel titrator module
2
Anionic/ alkaline titrant bottle
3
Cationic/ acid titrant bottle
4
RINSE: insert dosing tube for backflush of titrant
solution
5
FEED: insert feeding tube
• Before screw-in, shake the titrant bottles.
- Shake the titrant bottles each time the instru-
ment has been left unused
• Screw in titrant bottles (2, 3) from below into the
Travel titrator module, as shown in Fig. 4-6.
Hint
Be sure to install the bottles in the correct position. The
minus(-) sign identifies Pes-Na or alkaline solutions and
plus(+) stands for Poly-Dadmac or acid solution.
1
2
3
4
5
Содержание Mutek PCD-05 Smart
Страница 1: ...Operation Manual MütekTM PCD 05 Smart Light Particle Charge Detector ...
Страница 50: ...50 Operation Manual MütekTM PCD 05 September 2017 BTG V Measuring ...
Страница 58: ...58 Operation Manual MütekTM PCD 05 September 2017 BTG VIII Shutting down the system storage and disposal ...
Страница 61: ......
Страница 62: ...BTG Instruments AB P O Box 602 SE 661 29 Säffle Sweden Phone 46 533 426 00 www btg com ...