4-26
4.13 X-cutter Unit
4.13.1 Installing the Leaf Switch F Assy
1. Attach the Leaf switch F assy to the Tape sensor holder with the Leaf switch F
screw.
Tape sensor lever
X-cutter unit
Sensor holder
Sensor holder screw
Leaf switch F screw
Leaf switch F assy
Fig. 4.13-1
Installing the Leaf Switch F Assy
4.13.2 Installing the X-cutter Unit
Slide the X-cutter unit into position from the right side of the main unit and fasten it in
position with the two X-cutter screws.
X-cutter unit
X-cutter screws
Fig. 4.13-2
Installing the X-cutter Unit
Содержание LX-1200
Страница 1: ...SERVICE MANUAL MODEL LX 1200 LX 300 ...
Страница 2: ...COOL LAMINATOR SERVICE MANUAL MODEL LX 1200 LX 300 ...
Страница 5: ...Chapter 1 SPECIFICATIONS ...
Страница 9: ...Chapter 2 MECHANISMS ...
Страница 20: ...Chapter 3 DISASSEMBLY PROCEDURES ...
Страница 58: ...Chapter 4 ASSEMBLY PROCEDURES ...
Страница 105: ...Chapter 5 ELECTRONIC CONTROLLERS ...
Страница 127: ...Chapter 6 MAINTENANCE ...
Страница 149: ...Chapter 7 TROUBLESHOOTING ...
Страница 174: ...APP 1 Appendix Main PCB Circuit Diagram ...
Страница 175: ...July 2000 86S006BE0 Printed in Japan ...