![Biotek 50 TS Скачать руководство пользователя страница 79](http://html.mh-extra.com/html/biotek/50-ts/50-ts_instructions-for-use-manual_2756089079.webp)
4 |
50™ TS Washer
•
50 TS/8F and 8MF models:
Vacuum Filtration Evacuation Efficiency
Test
Measures the total residual volume of the plate after evacuation to
verify it is performing to specifications.
If your washer is equipped with Buffer Switching (“V” models), we recommend
performing this additional test annually (starting one year after installation):
•
Annual Buffer Switching Test.
Measures the variability of volumes
dispensed from tube to tube across the manifold, for each valve, when the
washer is used with this valve-switching module.
If you are testing a biomagnetic-separation (”M”) model using the
magnetic bead carrier, do not perform these tests with the magnet in
the carrier.