![Biotek 50 TS Скачать руководство пользователя страница 78](http://html.mh-extra.com/html/biotek/50-ts/50-ts_instructions-for-use-manual_2756089078.webp)
| 3
BioTek Instruments, Inc.
Recommended Performance Qualification Schedule
TASK
Installation
Qualification
Operational
Qualification
Performance
Qualification
Initially &
Annually
Monthly
System Self-Test
8, 8s, 12 Well Manifolds:
Evacuation Efficiency Test
Dispense Precision Test
Annual Buffer Switching Test
*
8,16 Well Manifold:
Evacuation Efficiency Test
Dispense Precision Test
Annual Buffer Switching Test
*
4, 2x8 Well Manifolds:
Evacuation Efficiency Test
Dispense Precision Test
Vacuum Filtration models:
Vacuum Filtration Evacuation Efficiency
Test
* Annual Buffer Switching testing can begin after first year of use.
It is important to note that the risk and performance factors associated
with your assays may require that some or all of the procedures be
performed more frequently than presented in the schedule.
Which Tests to Perform?
We recommend that you perform these routine tests on all manifolds before
first use (after the IQ) and then monthly:
•
Dispense Precision Test
: Measures the variability of volumes dispensed
from tube to tube across the manifold.
•
Evacuation Efficiency Test
: Measures the residual volume per well after
the aspiration aspect of plate washing. The lower the residuals per well, the
better the evacuation efficiency of the washer.