
5.0
Operation
5.8
Erecting a Complete Tower
Manoeuvre the machine to the stack site. Check the
following:
A.
The ground is firm and flat and not sloping excessively to
either side or forward i.e. more than 5°.
B.
Check there are no overhead obstacles or power lines.
It
is
recommended to keep 10
meters
away from power lines.
C.
Check the load is still secure
within the Transtacker.
D.
Check there are no by-standers, animals or property th
at
will be damaged
if any bales were to fall.
1.
Press and hold button to exit ‘Road Mod
e'
and enter
'S
tack
Manual
M
ode
'
(
Fig. 12
)
if required.
2.
Pull the joystick bac
k
(Fig.
26
)
to
pe
rform 'Auto Tip Bed
Up'. Before the 'Platform' starts to raise, the Transtacker will
automatically lower your forks and bring them to the front.
The 'Platform' wont raise until the left and right 'Forks
Forward' sensor has been met. Be careful that the top bales
remain secure on the 'Extension Frame' during the first
stages of tipping.
3.
When the
p
latform is half raised, the curved skids wi
ll
contact the ground
(
Fig. 27
)
.
At this point release the
brakes
, dip the clutch
and
allow the machine to roll back as
the platform is raised
.
4.
Continue to raise the stack until you are satisfied it
is
vertical and secure.
5.
Move the joystick left and righ
t
(Fig.
28
)
to open the
side
gates.
6.
Hold the 'BLACK' button on the joystick and push
forwa
rd
to release the
'H
ooks
'
(Fig.
29
)
.
7.
Keep the 'BLACK' button held down and move the
joysti
ck
left
(Fig.
30
)
to lower the
'Turnt
able
'
and lift off the
stack.
8. Keep the 'BLACK' button held down and move the
joystick right (
Fig. 31
) to extend the 'Extension Frame' and
'Turntable'.
9.. Still holding the 'BLACK' button move the joystick back
(
Fig. 32
) to remove the 'Rear Clamps'.
Curved skid
Fig. 26
Fig. 27
Fig. 28
Fig. 29
Fig. 30
Fig. 31
Fig. 32
12
Содержание Transtacker 4100
Страница 61: ...58...
Страница 62: ...59...
Страница 63: ...11 0 Hydraulic Systems 11 4 Valve Block Schematic Fig 168 60...
Страница 67: ...13 0 Maintenance 13 2 Pickup Grease Points Fig 172 64...
Страница 68: ...13 0 Maintenance 13 3 Grab Arm Grease Points Fig 173 65...
Страница 69: ...13 0 Maintenance 13 4 Turntable A Frame Grease Points Fig 174 66...
Страница 70: ...13 0 Maintenance 13 5 Side Gate Grease Points Fig 175 67...
Страница 71: ...13 0 Maintenance 13 6 Rear Clamps Grease Points Fig 176 68...
Страница 72: ...13 0 Maintenance 13 7 Chassis Grease Points Fig 177 69...
Страница 73: ...13 0 Maintenance 13 8 Platform Grease Points Fig 178 70...
Страница 74: ...13 0 Maintenance 13 9 Axle Grease Points Fig 179 71...
Страница 84: ...16 0 Operators Notes 81...
Страница 85: ...82...
Страница 86: ...83...
Страница 87: ...84...