
Audi Q7 2007
!
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
Repair Group 17 – Lubrication
6
146
Installing
Renew gaskets, seals and O-rings.
–
Remove old sealant from grooves on sump (top section)
and from sealing surfaces.
–
Remove sealant residue from sump (top section) and cylin-
der block with rotating plastic brush or similar.
–
Clean sealing surfaces; they must be free of oil and grease.
–
Cut off tube nozzle at front marking (nozzle approx. 1.5
mm
∅
).
–
Install seals -1- and -2- in top section of sump.
–
Apply beads of sealant -arrows- onto clean sealing surface
of sump (top section) as illustrated.
•
The grooves -arrows- on the sealing surfaces must be com-
pletely filled with sealant.
•
The beads of sealant must project 1.5 … 2.0 mm above
the sealing surface.
♦
The sealant beads must not be thicker than specified, oth-
erwise excess sealant could enter the sump and clog the
strainer in the oil pump.
♦
The sump (top section) must be installed within 5 minutes
after applying sealant.
WARNING!
Wear safety goggles.
Note
Note
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259