
Audi Q7 2007
!
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
Repair Group 15 – Cylinder head, valve gear
6
110
–
Pull covers upwards and turn them
1
/
4
turn (90
°
).
–
Unbolt injectors -arrows-.
–
Pull out injector units using puller -T10055- with adapter
-T10055/1-.
–
Loosen cylinder head cover bolts -arrows- in diagonal se-
quence.
–
Remove bolts and take off cylinder head cover.
Installing
Installation is carried out in the reverse order; note the follow-
ing:
♦
Renew cylinder head cover gaskets if damaged.
♦
Renew gaskets, seals and O-rings.
♦
Hose connections and hoses for charge air system must be
free of oil and grease before assembly.
♦
Secure all hose connections with the correct type of hose
clips (same as original equipment)
⇒
Parts catalogue.
–
Tighten cylinder head cover bolts diagonally and in stages.
Instructions for installing injectors:
•
Before installation, make sure the injectors and their sur-
roundings are clean. If necessary use a clean cloth to wipe
out the injector slot, taking care not to cause damage (do
not use sharp-edged tools).
•
Always install new seals and gaskets. Lubricate all seals
and gaskets lightly with engine oil or assembly oil before
installing.
Caution!
♦
Mark cylinder numbers on injector units.
♦
Used injectors must always be re-installed on the same
cylinder.
Note
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259