Chapter One
1 - 10
Movable Load Banks
Many Froment load banks are supplied for applications where they will be permanently
installed at a particular site location. However, in some applications the load bank is as a
temporary measure that is only required whilst generator tests are carried out.
This is quite common, for instance, with a new generator installation where the load bank
is used during commissioning and acceptance testing.
Figure 1-8
Additional components required for a movable load bank
Because of the temporary nature of the installation there are some specific design
differences between a load bank intended for permanent installation and one intended to
be “movable”.
These include:
External power supply inlet.
The load bank’s fans and control electronics can be powered
by the generator under test or (as recommended by Froment) a completely separate,
external power source. To make providing external power simple on a movable load bank,
a suitably rated IEC60309 connector is mounted on the unit either externally or behind a
lockable door with cable access.
Hot air
outlet
Cold air
inlet
Fan
motor
Air duct
Sigma II
Load bank
controller
Front panel controls
Load elements
Load
contactors
Fan
contactor
Current/Voltage
Transformers
Supply-on-test
External supply for
fan and controls
Remote control
unit
Step 1
Step 2
Step n
Fuses
Phase
rotation sensors
Supply
selector
© NJ Froment & Co. Ltd. This document may not be copied
or disclosed in whole or part without prior written authority.
Содержание Froment 8800 Series
Страница 1: ...8800 SERIES High Voltage Load Banks User Manual Power Technologies ...
Страница 2: ......
Страница 10: ......
Страница 42: ...Load Bank Installation and Setup 2 14 ...
Страница 106: ...A 4 Appendices Figure A 5 8800 Transformer view ...
Страница 110: ...A 8 Appendices Transformer Maintenance Schedule ...