Test 1 - AVR and governor adjustment setup
Figure 4-15
Test 1 page.
This first Test page shows the real-time Voltage and Frequency of the supply as it is tested,
with the calculated instrumentation powers in the left hand column. Use this test page for
adjusting the generator’s initial AVR and governor settings before starting a full load test.
Test 2 - Full load testing (line to line)
Figure 4-16
Test 2 page.
The second and third Test pages display the electrical data required for full-load testing
from different perspectives. Test 2 displays true rms three-phase measurements of the
line to line voltage (VL), and current (A) in the central column of the display, with the
calculated instrumentation powers in the left hand column.
Apparent Power
Power Factor
Actual Power
Real-time voltage and
frequency display
Apparent Power
Power Factor
Actual Power
Real-time voltage and
frequency display
RMS line to line voltage
RMS Current
Maximums and minimums
since the last load change
Chapter Four
Содержание Froment 8800 Series
Страница 1: ...8800 SERIES High Voltage Load Banks User Manual Power Technologies ...
Страница 2: ......
Страница 10: ......
Страница 42: ...Load Bank Installation and Setup 2 14 ...
Страница 106: ...A 4 Appendices Figure A 5 8800 Transformer view ...
Страница 110: ...A 8 Appendices Transformer Maintenance Schedule ...