2 - 8
2 - 9
Load Bank Installation and Setup
Connecting the Supply-on-Test
The load bank is fitted with a blank aluminium gland plate which allows access to the HV
compartment. Located directly behind the gland plater are the HV CTs, cables should be
fed into the load bank through the CT’s and securely fastened to the cable support rails.
The cables should be routed under the RMU to the cable connection points shown below.
Care should be taken to ensure the phases of the CTs and connection point correspond.
For the 8800, there is one M12 connection per phase
Figure 2-4
8800 RMU power terminal compartment
Protective earth connection.
Earth conductors must always be bonded to the frame of
the Supply-on-Test and connected to the grounding terminal of the load bank (marked
PE). The cables used must be suitably sized for the Supply-on-Test.
Additional frame bonding points are provided on the corners of the container.
L1 (U)
L2 (V)
L3 (W)
Operator Unit
(behind panel)
CT - L1 (U)
CT - L2 (V)
CT - L3 (W)
Ring Main Unit
PE
Auxiliary / Protection
LV Compartment
Содержание Froment 8800 Series
Страница 1: ...8800 SERIES High Voltage Load Banks User Manual Power Technologies ...
Страница 2: ......
Страница 10: ......
Страница 42: ...Load Bank Installation and Setup 2 14 ...
Страница 106: ...A 4 Appendices Figure A 5 8800 Transformer view ...
Страница 110: ...A 8 Appendices Transformer Maintenance Schedule ...