4 - 14
Settings 2 - Load bank
The load bank settings page shows the number and total maximum capacity of all the load
banks under control of the Hand-held. It also provides access to the Options pages, which
allow a number of aspects of the load bank’s operation to be modified.
The load bank capacity is calculated at the Supply-on-Test rating (voltage and frequency
and number of phases) and the values may change if you edit the supply voltage or
frequency on the Supply-on-test page (SETTINGS 2)
From Settings 1, press F1 (PAGE) to move to the Settings 2 page:
Figure 4-10
The Settings 2 - load bank page
Checking for load banks
Pressing F2 (CHECK) will cause the Hand-held to check the number of load banks
connected. It should be used to clear any errors on a load bank or when changing the
number of load banks connected to the Hand-held.
The status bar shows the total number of load banks that are connected. The load bank
rating (kVA) and power factor, displayed on the lower left of the screen, is calculated from
the load bank capacity at the Supply-on-Test ratings. The total Resistive, Inductive and
Capacitive load bank capacities are displayed on the right.
Resistive load
bank capacity
Inductive load
bank capacity
Capacitive load
bank capacity
Number of load
banks connected
Supply on test rating
(from Settings 1)
Load bank rating
and power factor
Hand-held Reference Guide
Содержание Froment 8800 Series
Страница 1: ...8800 SERIES High Voltage Load Banks User Manual Power Technologies ...
Страница 2: ......
Страница 10: ......
Страница 42: ...Load Bank Installation and Setup 2 14 ...
Страница 106: ...A 4 Appendices Figure A 5 8800 Transformer view ...
Страница 110: ...A 8 Appendices Transformer Maintenance Schedule ...