Status indicator lamp operation
The control panel contains a number of status indicator lamps. These include a lamp which
indicates the status of the ring main unit (RMU).
Figure 3-5
The Start and Reset indicator lamps located on the control panel.
When the load bank controls are first powered up all indicators will illuminate. This provides
a lamp test and indicates that the Sigma 2 processor’s self test sequence is running. When
the self-test sequence has completed successfully the Start lamp is extinguished and
Reset lamp will be illuminated steadily.
If the Ring Main Unit (RMU) is closed the corresponding status lamp will illuminate.
If no other lamps are lit the load bank is now operational and waiting for the Start button to
be pressed. Pressing the Start button activates the control system and will illuminate the
Start indicator. The Reset lamp will extinguish.
Fault Indicators
The indicators flash to provide a visual indication of faults detected by the Sigma controller.
Faults are classified as either a warning or as an error.
Errors.
These are serious fault conditions which result in the load bank performing a
controlled shut down when they occur.
If an error occurs the Start indicator lamp will be extinguished and the Reset indicator
lamp will begin to flash. An error code will be displayed on Sigma controller LED (see See
“Sigma 2 Load Bank Status Display” on page 5-6 for more details). If a Hand-held or PC
system is connected to the load bank the error message will be displayed on the screen
(See “Sigma 2 Load Bank Status Display” on page 5-6 for more on this).
Warnings.
A warning will alert you to an abnormal condition such as high temperature, but
will allow the unit to continue to run if required.
General load bank warnings are indicated by the Status indicator lamp flashing continuously
(if fitted).
3 - 9
Load Bank Operation
START
RESET
EMERGENCY
STOP
All doors must be shut
and guards fitted before
running this equipment.
INSTRUMENTATION
SELECTION SWITCH
HV INST
RUN
HV INST
STOP/WARNING
RMU
CLOSED
BUND
WARNING
Remove load and allow
elements to cool before
stopping the fan.
Warning!
High Leakage
Current
The Frame of this equipment must
be bonded to the protective earth
terminal of the supply on test.
A conductor of no less than half
the total cross-sectional area of the
supply conductors should be used.
PA15091
PA
10069
External Supply for Fan and Controls
PA
15091
Bund Drainage
Poin
t
PA
15091
Bund Drainage
Poin
t
PA
10215
External V
oltag
e
Metering Source
PA10214
Auxiliary Mains Input
for Anti-condensation
Heaters and Lighting
PA15091
HV Current Transformers
Located Behind this
Plate
PA15091
Transformer
Off-Circuit Tap Switch
Access
PA10216
Control Circuit
Emergency Stop
/ Disconnect Switch
Manual and
Documentation
Behind This Door
Main Power
Terminals
Behind This Door
PA10210
PA10211
Socket Outlet
(2A max)
Internal
RCD Protection
(2A max)
Socket Outlet
(2A max)
PA10259
SIGMA
Control
Froment
Load Bank
OUT
IN
PA10062
SIGMA
Control
OUT
IN
PA10062
SIGMA
Control
PA15037C
Lighting
Switch
OFF
ON
LV
HV
Содержание Froment 8800 Series
Страница 1: ...8800 SERIES High Voltage Load Banks User Manual Power Technologies ...
Страница 2: ......
Страница 10: ......
Страница 42: ...Load Bank Installation and Setup 2 14 ...
Страница 106: ...A 4 Appendices Figure A 5 8800 Transformer view ...
Страница 110: ...A 8 Appendices Transformer Maintenance Schedule ...