Automatic Test Mode
The Hand-held’s automatic load control function will allow you to set up a pre-programmed
sequence of up to 16 different loads of up to 99 hours duration. Once configured the test
sequence can then be repeated as often as is required. This is useful for transient testing,
fault finding or any other situation where a precisely controlled repeated test sequence is
required.
Figure 4-20
The Hand-held automatic test sequence
Press F2 (AUTO) to select
automatic testing mode.
Press I to apply the load
and start the automatic test
sequence.
When the test is running, use the
+ and - keys to adjust the load.
Press I to apply the
new load.
If necessary, press O to
remove the load before the
end of the automatic test
sequence.
Use F3 (SELECT) and the + or - keys to
edit values.
F1 (NEXT) moves to the next stage of the
sequence.
F2 (COPY) copies the current value to the
next stage.
Press F4 to return to the Test page.
Chapter Four
Содержание Froment 8800 Series
Страница 1: ...8800 SERIES High Voltage Load Banks User Manual Power Technologies ...
Страница 2: ......
Страница 10: ......
Страница 42: ...Load Bank Installation and Setup 2 14 ...
Страница 106: ...A 4 Appendices Figure A 5 8800 Transformer view ...
Страница 110: ...A 8 Appendices Transformer Maintenance Schedule ...