CFS300 SERIES OPERATION MANUAL
SECTION 6: FRONT PANEL OPERATION
Entire Contents Copyright
2016 by Adaptive Power Systems, Inc. (APS) • All Rights Reserved • No reproduction without written authorization from APS.
APS CFS300 Series Power Source Operation Manual
Page 99 of 156
A reverse block cursor will be blinking indicating the power source is waiting for a voltage
input from the operator. The numeric keypad must be used to enter a new voltage value
within range of the power source to be applied to the EUT at this time in place of the active
program step set voltage. To apply the voltage, press the “
Enter
” soft key. The new voltage
will be applied to the EUT, then the test sequence will resume after the current Delay +
Dwell time have expired. The “
Esc
” soft key may be used to exit out of this mode.
This manual interrupt mode during test sequence execution is particularly useful for pausing
and troubleshooting a unit under test when the measurement data indicates a possible
problem.
6.13.5
Triggering a Voltage Transient
To trigger a programmed voltage transient, the operator can press the “
Trig.
” soft key on
the measurement screen as shown below.
A beep will sound to indicate that the trigger has been activated for the Transient
parameters that have been entered into the program steps. The voltage transient will occur
at the start phase angles programmed in the program step. After the transient, program
execution will continue normally.