
Using the 2300-580-R Software with VectorStar ME7838G
4-7 Low-Band Calibration
3659 0.8 mm Cal/Ver Kit & 2300-580-R PVS UG
PN: 10410-00327 Rev. D
4-19
b.
Install a F-F adapter on VNA Port 1 so that a Female connector is available to the operator. (This
adapter will be attached to the 33.8G50 flange-to-0.8 mm adapter mounted in
.)
c.
Install a F-M adapter on VNA Port 2 so that a Male connector is available to the operator. (This
adapter will be attached to the 33.8G50 flange-to-0.8 mm adapter mounted in
.)
d.
When ready to proceed, click
OK
.
2.
The
VNA Calibration: Step 1 of 5
dialog box appears.
a.
Connect the Male Cal Kit Isolation Device to VNA Port 1.
b.
Connect the Female Cal Kit Isolation Device to VNA Port 2.
c.
When ready to proceed, click
OK
.
Figure 4-24.
Anritsu 0.8 mm Verification Dialog
Figure 4-25.
VNA Calibration: Step 1 of 5 Dialog