
2-7 Low-Band Calibration
Using the 2300-580-R Software with VectorStar ME7838D
2-20
PN: 10410-00327 Rev. D
3659 0.8 mm Cal/Ver Kit & 2300-580-R PVS UG
5.
The VNA measures the open/short device data, then the
VNA Calibration: Step 4 of 5
dialog box appears.
a.
Connect the Male Short #1 (1.20 mm) to VNA Port 1.
b.
Connect the Female Open to VNA Port 2.
c.
When ready to proceed, click
OK
.
6.
The VNA measures the short/open device data, then the
VNA Calibration: Step 5 of 5
dialog box appears.
a.
Remove the Short and the Open from Port 1 and Port 2, respectively.
b.
Slide the two T-R modules towards each other and connect the VNA Port 1 (Female) to VNA Port 2
(Male) directly.
c.
When ready to proceed, click
OK
.
7.
The program execution skips to
Section 2-9 “Application Interface – Main Menu Tab” on page 2-24
Figure 2-27.
VNA Calibration: Step 4 of 5 Dialog
Figure 2-28.
VNA Calibration: Step 5 of 5 Dialog