
DAVINO 120TW - USER AND MAINTENANCE MANUAL Rev.04
- Pag. 45
Chapter 4 – PRELIMINARY INSTRUCTIONS AND RUNNING-IN
4.1 PRELIMINARY INSTRUCTIONS
Upon delivery of the machine, the
AMOG
Service Department provides the user all the necessary
instructions concerning use and maintenance. The following is a legend that is defined in sequential order:
Safety Rules
Loading and Transport Rules
Machine Usage
Quality Control Standards
Fuel System and Tank Purging
Engine Start/Stop
“Breaking In” Period
Lubrification and Lubricants
Maintenance Timelines
4.2 RUNNING IN
Every AMOG machine is field-
tested using all it’s components prior to shipping. Therefore, upon arrival, the
required “Breaking In” period is 50 hours of operational use.
During the “Breaking In” period operate with light to medium loads and at reduced speeds. This will allow
the oil and hydraulic systems to reach normal operating temperature evenly.
Allow the cooling system to reach normal operating temperature prior to maximizing the efforts of the
machine.
Unless braking for an emergency situation, do not make sudden stops while the machine is under stress
and the engine is not at normal operating temperature.
For maintenance ope
rations during the “Breaking In” period, refer to the Maintenance Timelines section of
the manual.
The machine’s hour counter is located on the operator’s console.