PN 9000-280-VE, Rev B
Installation and Start-up
Safety Considerations
Before beginning the installation of the analyzer and before powering
it up, review and follow all safety information following the Table of
Contents near the beginning of this manual. This information de-
scribes procedures to follow to avoid personal injury and/or damage
to the equipment. All regulatory agency and personnel safety proce-
dures for your jurisdiction must be followed.
The installation of the analyzer must be in accordance with all of the
customer and local regulatory standards and procedures. There are no
operator-serviceable components inside the analyzer. Refer all servic-
ing to qualified personnel.
Reference pressure must be applied before the CCR (Continuous Cata-
lyst Regeneration) is pressurized.
During process start-up and whenever power is removed from the
analyzer, the aspirator should be turned off and nitrogen applied to
the calibration gas port at 3 SCFH flow to ensure the process gas is
purged from the analyzer. The 3 SCFH nitrogen purge through the
calibration port should be maintained until the analyzer is turned on
and is hot – preferably 24 hours.
Do not turn on the aspirator until the analyzer has been turned on and
is hot – preferably 24 hours. If you turn off the analyzer or the process
is shut down, turn off the aspirator to avoid plugging problems.
Installation and Start-Up
|
2-1
Содержание WDG-V UOP
Страница 1: ...WDG V UOP Combustion Analyzer ATEX IECEx USER MANUAL PN 9000 280 VE_Rev C...
Страница 40: ...PN 9000 280 VE Rev B Figure 2 7 Conduit Entries 2 18 Thermox WDG V UOP ATEX IECEx Analyzer...
Страница 96: ...PN 9000 280 VE Rev B WDG V UOP Series Analyzer Rating Labels 4 6 Thermox WDG V UOP ATEX IECEx Analyzer...