PN 9000-280-VE, Rev B
Unpacking and Inspecting the Equipment
Remove any packing material from the WDG-V UOP Analyzer. Check for dam-
age. If equipment is damaged, notify the carrier and contact AMETEK Service
(
https://www.ametekpi.com/customersupport/requestsupport
) immediately if
parts are missing or damage is found, and to verify if damaged parts will
require replacement prior to safely installing and operating the analyzer/
equipment.
Tools, Equipment, and Supplies Required
for Installation
To install the analyzer you need the following tools, equipment, and supplies:
• Set of open-end wrenches for fittings.
• Set of metric hexagonal wrenches.
• Set of ball drivers.
• Wire cutters, strippers, and crimpers.
• Flat blade instrument screwdriver.
• Soft, nonabrasive cloth.
• Wrist strap (for grounding).
• Detergent-based leak detector (Snoop® or another suitable leak detection
agent is permissible).
Installation and Start-Up
|
2-3
Содержание WDG-V UOP
Страница 1: ...WDG V UOP Combustion Analyzer ATEX IECEx USER MANUAL PN 9000 280 VE_Rev C...
Страница 40: ...PN 9000 280 VE Rev B Figure 2 7 Conduit Entries 2 18 Thermox WDG V UOP ATEX IECEx Analyzer...
Страница 96: ...PN 9000 280 VE Rev B WDG V UOP Series Analyzer Rating Labels 4 6 Thermox WDG V UOP ATEX IECEx Analyzer...