PN 9000-280-VE, Rev B
Replacing the Furnace
To replace the Furnace (Figure 3-4):
1. Open the analyzer and expose the analyzer components.
2. Close the isolation valves on the inlet and outlet of the process. Shutoff
levers should be in the vertical position.
3. Disconnect Cell furnace wires.
4. Remove the Thermocouple assembly from the furnace.
5. Remove the Cell.
6. Remove the Flow Sensor.
7. Loosen the Swagelok nut at the bottom of the furnace. Loosen the
Swagelok nut below the flow sensor.
8. Remove the Furnace assembly.
9. Install the new Furnace assembly in place.
10. Reinstall the Thermocouple, Flow Sensor, and Cell.
11. Reconnect the wires on the
Sensor
board.
Figure 3-4.
Furnace Assembly.
Maintenance and Troubleshooting
|
3-15
Содержание WDG-V UOP
Страница 1: ...WDG V UOP Combustion Analyzer ATEX IECEx USER MANUAL PN 9000 280 VE_Rev C...
Страница 40: ...PN 9000 280 VE Rev B Figure 2 7 Conduit Entries 2 18 Thermox WDG V UOP ATEX IECEx Analyzer...
Страница 96: ...PN 9000 280 VE Rev B WDG V UOP Series Analyzer Rating Labels 4 6 Thermox WDG V UOP ATEX IECEx Analyzer...