PN 9000-280-VE, Rev B
Recommended Maintenance
Calibration
Check calibration and/or recalibrate the analyzer every 90 days.
Safety Considerations
Before working on the analyzer, read the entire procedure you will
be performing to learn how to safely perform maintenance on and
troubleshoot the WDG-V UOP Analyzer.
Before performing any maintenance, service, or troubleshooting on
the analyzer, review and follow all safety information under “Person-
nel and Equipment Safety Information” following the Table of Con-
tents near the beginning of this manual. This information describes
procedures to follow to avoid personal injury and/or damage to the
equipment.
All regulatory agency and personnel safety proce-
dures for your jurisdiction must be followed.
Personnel should be thoroughly familiar with the operation of the
WDG-V UOP Analyzer before performing the maintenance and
troubleshooting procedures described in this section.
Preventing leaks in the sample system is critical to proper analyzer op-
eration. Most leaks are preventable with regular cleaning and replace-
ment of wetted parts.
Leak check the analyzer’s sample system whenever it has been dis-
mantled for maintenance.
3-20 | Thermox
®
WDG-V UOP ATEX-IECEx Analyzer
Содержание WDG-V UOP
Страница 1: ...WDG V UOP Combustion Analyzer ATEX IECEx USER MANUAL PN 9000 280 VE_Rev C...
Страница 40: ...PN 9000 280 VE Rev B Figure 2 7 Conduit Entries 2 18 Thermox WDG V UOP ATEX IECEx Analyzer...
Страница 96: ...PN 9000 280 VE Rev B WDG V UOP Series Analyzer Rating Labels 4 6 Thermox WDG V UOP ATEX IECEx Analyzer...