PN 9000-280-VE, Rev B
Rapid Exchange Purge System
Connections
Connect instrument air to the analyzer purge inlet. Maintain the pressure and
flow as directed on the purge warning label.
The purge apparatus provided by AMETEK meets requirements for
hazardous locations under certain conditions.
• Do not exceed the maximum temperature rating listed in the Specifica-
tions chapter of this manual.
• The WDG-V UOP analyzer contains a flame arrestor to prevent it from being
an ignition source to the process for short periods of high combustible lev-
els (25 % of LEL – lower explosive limit) in the process. The flame arrestor
is not, however, intended to protect the process where the combustibles
levels are always high.
Purging Operation – “Safe” Pressure
“Safe” pressure, for purposes of this manual, is defined as between
0.15 and 0.35 inches of water column. Do not exceed “Safe” pressure
with the Enclosure Pressure Control Valve.
The regulator may be in the locked position upon arrival. To adjust the
regulator, pull the handle to the outward position.
Carefully insert T-bar valve key to align valve stem tip of both valves.
Practice locking and unlocking key in the RECV valve stem. Become
familiar with this process to ease operation of the system.
Operators must follow-step-by-step sequence in the Start-Up instruc-
tions found on the electronics box lid.
2-10 | Thermox
®
WDG-V UOP ATEX-IECEx Analyzer
Содержание WDG-V UOP
Страница 1: ...WDG V UOP Combustion Analyzer ATEX IECEx USER MANUAL PN 9000 280 VE_Rev C...
Страница 40: ...PN 9000 280 VE Rev B Figure 2 7 Conduit Entries 2 18 Thermox WDG V UOP ATEX IECEx Analyzer...
Страница 96: ...PN 9000 280 VE Rev B WDG V UOP Series Analyzer Rating Labels 4 6 Thermox WDG V UOP ATEX IECEx Analyzer...